v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Editing Pump-stack method
Jump to navigation
Jump to search
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
If you are creating a redirect to the current version's page, do not use any namespace. For example: use #REDIRECT [[Cat]], not #REDIRECT [[Main:Cat]] or #REDIRECT [[cv:Cat]]. See DF:Versions for more information.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 116: | Line 116: | ||
=== Draining an aquifer layer into a lower one === | === Draining an aquifer layer into a lower one === | ||
− | If your current pumped layer has another layer of aquifer below it, then the first thing you need to do is drill down into that aquifer layer and see if there is another aquifer layer below that. Doing this is called drilling a pilot hole. To do this, dig up/down stairs under the top | + | If your current pumped layer has another layer of aquifer below it, then the first thing you need to do is drill down into that aquifer layer and see if there is another aquifer layer below that. Doing this is called drilling a pilot hole. To do this, dig up/down stairs under the top right set of stairs in the pit. This corresponds to the tile that is being actively pumped dry by the top of the two pumps. Once again, you're looking for a damp stone cancellation once the stairs are dug. |
{|class="wikitable1" | {|class="wikitable1" |