v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Editing Manager
Jump to navigation
Jump to search
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
If you are creating a redirect to the current version's page, do not use any namespace. For example: use #REDIRECT [[Cat]], not #REDIRECT [[Main:Cat]] or #REDIRECT [[cv:Cat]]. See DF:Versions for more information.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 55: | Line 55: | ||
==Disadvantages== | ==Disadvantages== | ||
− | One disadvantage of the work order system is that | + | One disadvantage of the work order system is that no work will be performed until the manager finishes validating the order. Work order validation appears to be fairly high priority, but it's best to ensure your manager has ample free time and isn't typically called far from the office for timely order validation. |
A second disadvantage is that if there is more than one workshop which can fulfill a particular job set (such as several ordinary [[glass furnace]]s dedicated to [[sand]] collection, plus several [[magma glass furnace]]s for actual glass production) then the manager will distribute the jobs amongst all those workshops. While this can be an advantage (for example, if you want to speed up the work orders by having multiple workshops), this will make it difficult to dedicate different workshops to different tasks. This can be prevented by entering the interface of specific workshops and moving to the Work orders menu; setting "General work orders allowed" to 0 will prevent the manager from assigning tasks. | A second disadvantage is that if there is more than one workshop which can fulfill a particular job set (such as several ordinary [[glass furnace]]s dedicated to [[sand]] collection, plus several [[magma glass furnace]]s for actual glass production) then the manager will distribute the jobs amongst all those workshops. While this can be an advantage (for example, if you want to speed up the work orders by having multiple workshops), this will make it difficult to dedicate different workshops to different tasks. This can be prevented by entering the interface of specific workshops and moving to the Work orders menu; setting "General work orders allowed" to 0 will prevent the manager from assigning tasks. |